Product Overview
The steel solar carport canopy uses a single-row V-column frame for narrow lots and perimeter parking. It delivers the same waterproof PV roof as our double-row structure in a lighter, faster-to-build format.

All connections are bolted — no site welding — so a small crew completes one bay per day. The canopy suits 4-20 bays per unit and multiple units can be chained along a parking aisle.
Key Features
- V-column single row — fits narrow and perimeter lots
- Bolt-only assembly — no site welding, one bay per day
- 4-20 bays per unit — chainable along parking aisles
- Integrated drainage — gutters and downpipes included
- HDG steel frame — C4 corrosion protection
- EV charger ready — conduit path designed in
Application Scenarios
Where this canopy fits best:
- Small commercial lots — retail and restaurant parking
- Hotel and resort parking — guest shade with energy yield
- Public facilities — schools, libraries, clinics
- Residential complexes — apartment parking upgrades

Configuration Options
- Column style — V / N / round column
- Clear height — 2.6 / 3.0 / 3.5 m
- Bays — 4 / 8 / 12 / 20 per unit
- Module area — full canopy or shaded strips
- Color — HDG natural or powder-coated RAL
Product Specifications
| Frame | Q235B hot-dip galvanized ≥ 80 μm |
| Sub-frame | AL6005-T5 rails |
| Clear height | 2.6-3.5 m |
| Bays per unit | 4-20 |
| Wind load | ≤ 56 m/s |
| Snow load | ≤ 1.0 kN/m² |
| Warranty | 10 years structural |
All products are manufactured in our ISO 9001 certified factory and carry CE / SGS certification. Custom requirements are welcome.
Quality Certifications
Ruhai Material is ISO 9001 certified and ships products compliant with CE and SGS requirements worldwide. Material certificates and test reports are available with each shipment.
Frequently Asked Questions
What is the MOQ for the steel solar carport canopy?
MOQ is 1 unit (4 bays); sample units for developers are welcome.
How fast is installation?
A 4-person crew completes one 4-bay unit in 3-4 days including modules.
Can it be powder-coated to our brand color?
Yes — any RAL color over the galvanizing.
Lead time?
18-25 days after drawing approval.
Request a Quote
Send us your specifications, quantity and target port — our sales team replies within 24 hours with a detailed quotation. Send an inquiry now.



Reviews
There are no reviews yet.